Saving on Substructure

The innovative idea of the TTE® construction element is to replace the base course layer material by an intelligent load distribution system and, in this way, to combine the covering and base course layer into one system.

The deformation and pressure resistant TTE® elements deliver high distribution of loads over an area based on their large contact surface as well as the interlocking and/or force-fitting nature of the individual elements. Changes in the load bearing capacity of the substrate are strongly reduced, whereby the base course layer material needed is reduced considerably, and in some cases can be replaced completely. At the same time the tolerable contact pressure for the ground is not exceeded through loading from vehicle traffic and also post-compacting is prevented.

Load Distribution Comparison FLL Gravel Lawns and the TTE® construction principle

Conventional construction principle

RStO Bk 0,3 / BKL V/VI

Saving on Substructure

TTE construction principle 2

for occasional heavy good traffic (40 t)

Saving on Substructure

Saving on Substructure

The innovative idea of the TTE® construction element is to replace the base course layer material by an intelligent load distribution system and, in this way, to combine the covering and base course layer into one system.

The deformation and pressure resistant TTE® elements deliver high distribution of loads over an area based on their large contact surface as well as the interlocking and/or force-fitting nature of the individual elements. Changes in the load bearing capacity of the substrate are strongly reduced, whereby the base course layer material needed is reduced considerably, and in some cases can be replaced completely. At the same time the tolerable contact pressure for the ground is not exceeded through loading from vehicle traffic and also post-compacting is prevented.

Load Distribution Comparison FLL Gravel Lawns and the TTE® construction principle

Conventional construction principle

RStO Bk 0,3 / BKL V/VI

Saving on Substructure

TTE construction principle 2

for occasional heavy good traffic (40 t)

Saving on Substructure
TTE Global Logo

We provide our customers with a system that reduces costs and resources, while providing a contribution to nature. We deliver ready-to-use grids, which result in a 25-50% resource and cost reduction. We strive to help to meet the increased environmental requirements for land consolidation.

latest news

Latest News Image

Jodrell Bank Discovery Centre

14 June 2018

TTE is currently being installed at Jodrell Bank Discovery Centre, best-known as the home of the world-famous Lovell Telescope -A near 90m high radio telescope that has become an iconic landmark on the Cheshire landscape. Images and case study to follow soon

Read More

contact

TTE Global Ltd
83 Shore Road
Greenisland
Carrickfergus, BT38 8TZ
Co. Antrim

+44 (0)7904 118215
+44 (0)7553 961099
E: info@tte-global.com

Social Media Icons,
TTE Global Logo

We provide our customers with a system that reduces costs and resources, while providing a contribution to nature. We deliver ready-to-use grids, which result in a 25-50% resource and cost reduction. We strive to help to meet the increased environmental requirements for land consolidation.

latest news

Latest News Image

Jodrell Bank Discovery Centre

14 June 2018

TTE is currently being installed at Jodrell Bank Discovery Centre, best-known as the home of the world-famous Lovell Telescope -A near 90m high radio telescope that has become an iconic landmark on the Cheshire landscape. Images and case study to follow soon

Read More

contact

TTE Global Ltd
83 Shore Road
Greenisland
Carrickfergus, BT38 8TZ
Co. Antrim

+44 (0)7904 118215
+44 (0)7553 961099
E: info@tte-global.com

Social Media Icons,