Construction Principle 1

TTE® Construction Principle 1 Near-natural surface area reinforcement

Exclusively for passenger car traffic up to a total weight of 3.5 t

This construction principle allows very environmentally friendly construction which integrates in and retains the natural ground and its ecological functions. There is no intervention in the structure of the ground and the living ground zone. Since the water balance is not destroyed, the usable area can function as a natural surface seepage area despite loading of it. Loads from pedestrians and passenger cars can be absorbed by the strong, load distributing behaviour of the TTE® system without a base course layer. This allows one to make enormous savings as regards building time and costs.

Main Brochure PDF

TTE®-MultiDrainPLUS 2000

800 x 400 x 60 mm, ca. 8.6 kg/piece (ca. 27 kg/m2) Web thickness: 14 / 15 mm

Special features

  • very near-natural complete retention and seepage as well as biological cleaning of the rain water
  • no base course layer required
  • very near-natural ground conditions and vegetation conditions
  • strongly reduced building time/costs - ideal for self-build
  • an economic long-term solution

Example areas of application

  • private passenger car parking spaces
  • garage entrances
  • camping van parking spaces
  • bicycle stand spaces
  • footpaths & bike lanes
  • temporary surface reinforcement
  • an ecological base course layer for terraces and pavements with a paving covering or floor paving

TTE® Green 1



Thick and hard wearing greening with the TTE® system

Optimal vegetation conditions exist through the direct connection to the ground. The TTE® system protects the turf and the root areas from pressure loads.

Properties



1) Dimensioning as a surface seepage area according to DWA-A 138
2) Determination and requirements upon soil passages according to DWA-A 138 / M 153

TTE® Paving 1

Properties



1) Dimensioning as a surface seepage area according to DWA-A 138
2) Determination and requirements upon soil passages according to DWA-A 138 / M 153

Further surface layers

Paving stone
and slab coverings

Water-bound
coverings

Ballast and
gravel surfaces

Simple and quick - the TTE® Construction Principle 1

1. Applying the bedding to the flattened off substrate

2. Laying of TTE® elements on the fine network

3. Filling the TTE® elements with TTE® paving stones and filling substrate (+ seeding)

Main Brochure PDF

TTE® Construction Principle 1 Near-natural surface area reinforcement

Exclusively for passenger car traffic up to a total weight of 3.5 t

This construction principle allows very environmentally friendly construction which integrates in and retains the natural ground and its ecological functions. There is no intervention in the structure of the ground and the living ground zone. Since the water balance is not destroyed, the usable area can function as a natural surface seepage area despite loading of it. Loads from pedestrians and passenger cars can be absorbed by the strong, load distributing behaviour of the TTE® system without a base course layer. This allows one to make enormous savings as regards building time and costs.

Main Brochure PDF

TTE®-MultiDrainPLUS 2000

800 x 400 x 60 mm, ca. 8.6 kg/piece (ca. 27 kg/m2) Web thickness: 14 / 15 mm

Special features

  • very near-natural complete retention and seepage as well as biological cleaning of the rain water
  • no base course layer required
  • very near-natural ground conditions and vegetation conditions
  • strongly reduced building time/costs - ideal for self-build
  • an economic long-term solution

Example areas of application

  • private passenger car parking spaces
  • garage entrances
  • camping van parking spaces
  • bicycle stand spaces
  • footpaths & bike lanes
  • temporary surface reinforcement
  • an ecological base course layer for terraces and pavements with a paving covering or floor paving

TTE® Green 1



Thick and hard wearing greening with the TTE® system

Optimal vegetation conditions exist through the direct connection to the ground. The TTE® system protects the turf and the root areas from pressure loads.

Properties



1) Dimensioning as a surface seepage area according to DWA-A 138
2) Determination and requirements upon soil passages according to DWA-A 138 / M 153

TTE® Paving 1

Properties



1) Dimensioning as a surface seepage area according to DWA-A 138
2) Determination and requirements upon soil passages according to DWA-A 138 / M 153

Further surface layers

Paving stone
and slab coverings

Water-bound
coverings

Ballast and
gravel surfaces

Simple and quick - the TTE® Construction Principle 1

1. Applying the bedding to the flattened off substrate

2. Laying of TTE® elements on the fine network

3. Filling the TTE® elements with TTE® paving stones and filling substrate (+ seeding)

Main Brochure PDF

TTE Global Logo

We provide our customers with a system that reduces costs and resources, while providing a contribution to nature. We deliver ready-to-use grids, which result in a 25-50% resource and cost reduction. We strive to help to meet the increased environmental requirements for and consolidation.

contact

TTE Global Ltd
83 Shore Road
Greenisland
Carrickfergus, BT38 8TZ
Co. Antrim

+44 (0)7904 118215 / +44 (0)7553 961099
info@tte-global.com