Yard / Exercise areas and cattle paths WITHOUT A SUBSTRUCTURE
- it functions WITHOUT a substructure due to the high own load-bearing capacity of the elements
- is laid directly on the building ground (an ON TOP construction, no excavation of the ground)
- is a separating and base course layer in one system
- can be laid oneself QUICKLY and SIMPLY
- for exercise areas / paddocks
- guarantees dewatering due to the ON TOP construction and high number of joints
- always remains flat due to the 4-part interlocking system
- is long-lasting and retains its value, can be removed damage-free and can be used again
- is impact dampening => easy on the joints due to the movable interlocking of the individual elements
TTE®-MultiDrainPLUS 3000
800 x 400 x 60 mm, approx. 8.6 kg/piece (ca. 27 kg/m²) Web thickness: 14 / 15 mm
WHAT is TTE®? A separating and base course layer in one system
TTE® elements are significantly more stable and heavier than other riding arena grids, paddock mats or turf grid plates. Due to a high own load-bearing capacity and the intelligent load distribution, up to 100% of the base course layer material can be saved on and the TTE® construction principle can be laid directly onto the building ground.
TTE® Separates Supports Dewaters
- TTE® replaces the base course layer; the components simply need a levelling course of about 5 cm, the chamber filling and maybe the covering layer
- Therefore with TTE® you save significant costs for the material and building time/costs
- Due to the ON TOP construction water can seep away permanently and the surface is usable all year round
HOW does TTE® work? Build WITHOUT A SUBSTRUCTURE due to the load distribution
Due to the high own load-bearing capacity and the 4-sided interlocking system of the TTE® elements loading at a point from the hoof is distributed over a wider area. Therefore TTE® replaces the base course layer. The riding arena floor or the exercise area reinforcement are neither sealed nor compacted. There is no need for cost-intensive material and building works (one dispenses with excavation of the ground, procurement of base course layer material and installation).
HOW does TTE® work?
YOU CAN COMPLETELY FORGET: hard, dense surfaces, mud and uneven parts
NO MORE MUD
- no sealing/compaction of the surface
- water permeable over the long-term
- supported by forced mechanism joints
=> build-up of mud is impossible
permanently FLAT
- a 4-part interlocking system and wide contact surface => permanently flat
easy on the joints
- installation directly onto natural soil => hard on soft
- reduced wear on the joints and the structure
- increased impact dampening due to the elastic layer
=> the forest floor effect
ecological & low odour
- the retained top soil (microorganisms) filters out and decomposes pollutants
- low odour and hygienic surfaces
- no intervention in the ground => makes it far easier to go through the building approval process